Journal of Engineering and Management in Industrial System
Vol 8, No 2 (2020)

ANALYSIS ON THE PURCHASING DATA TO RE-DESIGN THE PROCEDURE OF TURNAROUND MAINTENANCE

Winda Nur Cahyo (Universitas Islam Indonesia)
Buchairi Zaman (Universitas Islam Indonesia)



Article Info

Publish Date
07 Aug 2020

Abstract

Turnaround (TA) is a large-scale maintenance activity (extraordinary maintenance activities), which is carried out periodically (repeated large-scale maintenance), where the work referred to can only be carried out when the unit is stopped operating. The main scope of work is inspection (inspection), repair, cleaning equipment. The success or failure of turnaround activities is very influential from careful preparation, some of the failures of turnaround activities result from unplanned preparations. One factor is the readiness of the material. This paper discusses the direct involvement of the material procurement process in determining better TA preparation time. The historical data from the purchasing is analyses and then the result is combined with the new proposed procedure of the TA maintenance. The new procedure has three months less than the current procedure.

Copyrights © 2020






Journal Info

Abbrev

jemis

Publisher

Subject

Industrial & Manufacturing Engineering

Description

Journal of Engineering and Management in Industrial System is a peer reviewed journal. The journal publishes original papers at the forefront of industrial and system engineering research, covering theoretical modeling, inventory, logistics, optimizations methods, artificial intelligence, bioscience ...