EKONOMIA
Vol 1, No 1 (2012)

ANALISIS PENUGASAN KARYAWAN BAGIAN PRODUKSI PADA CV. FAUZAN RAMADHAN DI MUARA BADAK

Agustian, Fery (Unknown)



Article Info

Publish Date
29 Apr 2013

Abstract

The study was conducted on CV.FAUZAN RAMADHAN in Muara Rhinos during the month of April-May 2012. Of this research in the data obtained that the decay has occurred black shrimp ranges 20-30 kg were produced. This decay occurs because the processing of the raw materials of black shrimp resolved differently in processing time starts at 07.30 am and finish at around 09:30 to 10:00 am.Analysis using the Hungarian method calculation results show after held assignments on the production employees in particular sub-section processing variations 5 working group (Task: Cleaning, Proofreading, washing, weighing and preparation) obtained by Hungarian method of processing turnaround time of 120 minutes is lower than the standard settlement time from 5 companies to task group working group variation in the amount of 150 minutes.

Copyrights © 2012