EKONOMIA
Vol 2, No 1 (2013)

PENGUKURAN WAKTU KERJA PEMBUATAN KANOPI PADA MUTIARA GYPSUM SANGATTA

Kumala, Sapta Erna (Unknown)



Article Info

Publish Date
17 Jan 2014

Abstract

 The purpose of this study was to determine the standard labor time kerjamemproduksikanopipada Gypsum Pearl company in Sengata . The experiment was conducted for 3 months ( April to June 2013) on Pearl Gypsum in Sangatta , which bekaitan Measurement Periods Work on Pearl Canopy Gypsum manufacture in Sangatta.Kegiatan dilakukanyaitu research : A literature study , field observations , interviews , documentation , data collection and analysis . dikupulkan data in the study include : a general overview of the company , and the organizational structure of respondents . The analytical tool used in this study is 1 ) . Average - Average time ( Adverage time ) 2 ) Nominal Time ( Norml time ) 3 . Standard Time ( Standard time ) Based on the analysis results obtained by calculation as follows : 1 ) Average time to assemble the canopy 19 hours 35 minutes 2 ) normal time producing the canopy on Pearl company in the Sengata Gypsum is 1.1736 for 55 minutes or 19 hours menit.3 ) . standard time in the company manufactures canopies Pearl Gypsum in Sengata using kelonggaraan factor by 15 % of the normal time is for 1,349 minutes or 22 hours and 48 minutes less than the average time - average produced by other employers canopy is 29 hours . Keywords : Work Time   

Copyrights © 2013