Jurnal Pengembangan Energi Nuklir
Vol 20, No 2 (2018): Desember 2018

OVERNIGHT COST ESTIMATION OFINDONESIA’S COGENERATION POWER PLANT FOR INDUSTRIAL PROCESSES

Rizki Firmansyah Setya Budi (Unknown)
Arum Puni Rijanti (Unknown)
Sahala M. Lumbanraja (Unknown)
Elok S. Amitayani (Unknown)
Moch. Djoko Birmano (Unknown)
Edwaren Liun (Unknown)



Article Info

Publish Date
18 Feb 2019

Abstract

Indonesia’s cogeneration power plant for industrial processes (PeLUIt) is needed to be implemented in Indonesia. Economic analysis is an important factor for PeLUIt implementation. One of the data that needs in the analysis is overnight cost. This research estimates HTGR’s overnight cost by using scaling law.By using the estimated value, it can be calculated the PeLUIt overnight cost. The research’s purpose is to obtain an estimation of overnight costs of PeLUIt. The estimation result shows the overnight cost of PeLUIt. PeLUIt 10 MWth has an overnight cost 166,26 million USD. PeLUIt 30 MWth has an overnight cost 233,49 million USD. PeLUIt 50 MWth has an overnight cost 281,31 million USD. PeLUIt 100 MWth has an overnight cost 371,86 million USD. PeLUIt 350 MWth has an overnight cost 657,16 million USD.Keywords: PeLUIt; Estimation; High temperature gas-cooled reactor; Overnight cost; Scaling law

Copyrights © 2018






Journal Info

Abbrev

jpen

Publisher

Subject

Decision Sciences, Operations Research & Management Earth & Planetary Sciences Electrical & Electronics Engineering Energy Engineering Environmental Science Industrial & Manufacturing Engineering Social Sciences

Description

Jurnal Pengembangan Energi Nuklir publishes scientific papers on the results of studies and research on nuclear energy development with the scope of energy and electricity planning, nuclear energy technology, energy economics, management of nuclear power plants, national industries that support ...