JIEMS (Journal of Industrial Engineering and Management Systems)
Vol 3, No 2 (2010): Journal of Industrial Engineering and Management Systems (JIEMS)

Identifikasi Hubungan Variabel Indikator Ekonomi dengan Estimasi Biaya Proyek Konstruksi

Lydiawati Soelaiman (Fakultas Ekonomi, Universitas Tarumanagara)
Basuki Anondho (Teknik Sipil, Universitas Tarumanagara.)



Article Info

Publish Date
15 Mar 2017

Abstract

Contractors’ cost estimation has a very important effect in every company’s performance which will be needed in fulfilling every customer’s needs. Nevertheless, in order to minimize the inaccuracy between the estimated cost and actual performance, it will be better to accommodate the economic condition in terms of estimating. In all the developing countries such as in Indonesia, the economic condition is most likely to be unstable thus it will be influence to the accuracy of estimation. The purpose of this research is to find all the indicator economic variables which had been influenced so the project is able to be optimized. The result shows that money currency has a strong impact. In order to comprehend this information, data needs to be collected from central bank, newspapers, the expert, and also the estimator themselves.Keywords: Estimasi Biaya, Proyek Konstruksi, Pengaruh Indikator Ekonomi

Copyrights © 2017






Journal Info

Abbrev

jiems

Publisher

Subject

Control & Systems Engineering Decision Sciences, Operations Research & Management Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

Journal of Industrial Engineering and Management Systems (JIEMS) publishes scientific papers, including empirical research, theoretical and scientific related original industrial engineering. The focus and scope of JIEMS include manufacturing systems, production, logistics, supply chain management, ...