TELKOMNIKA (Telecommunication Computing Electronics and Control)
Vol 16, No 5: October 2018

Optimizing Effort Parameter of COCOMO II Using Particle Swarm Optimization Method

Kholed Langsari (Fatoni University)
Riyanarto Sarno (Institut Teknologi Sepuluh Nopember (ITS))
Sholiq Sholiq (Institut Teknologi Sepuluh Nopember)



Article Info

Publish Date
01 Oct 2018

Abstract

Estimating the effort and cost of software is an important activity for software project managers. A poor estimate (overestimates or underestimates) will result in poor software project management. To handle this problem, many researchers have proposed various models for estimating software cost. Constructive Cost Model II (COCOMO II) is one of the best known and widely used models for estimating software costs. To estimate the cost of a software project, the COCOMO II model uses software size, cost drivers, scale factors as inputs. However, this model is still lacking in terms of accuracy. To improve the accuracy of COCOMO II model, this study examines the effect of the cost factor and scale factor in improving the accuracy of effort estimation. In this study, we initialized using Particle Swarm Optimization (PSO) to optimize the parameters in a model of COCOMO II. The method proposed is implemented using the Turkish Software Industry dataset which has 12 data items. The method can handle improper and uncertain inputs efficiently, as well as improves the reliability of software effort. The experiment results by MMRE were 34.1939%, indicating better high accuracy and significantly minimizing error 698.9461% and 104.876%.

Copyrights © 2018






Journal Info

Abbrev

TELKOMNIKA

Publisher

Subject

Computer Science & IT

Description

Submitted papers are evaluated by anonymous referees by single blind peer review for contribution, originality, relevance, and presentation. The Editor shall inform you of the results of the review as soon as possible, hopefully in 10 weeks. Please notice that because of the great number of ...