TELKOMNIKA (Telecommunication Computing Electronics and Control)
Vol 15, No 4: December 2017

Design and Evaluation of Submersible 11/0.415kV Distribution Substation for Flood Prone Areas

M. D. M. Amir (Kawasan Institusi Penyelidikan, Malaysia)
S. Ishak (Kawasan Institusi Penyelidikan, Malaysia)
A. Raj Gopal (Kawasan Institusi Penyelidikan, Malaysia)



Article Info

Publish Date
01 Dec 2017

Abstract

Flood levels exceeding 2 metres above ground level has been observed causing electrical equipment in the 11/0.415kV substation to be fully submerged. This caused widespread supply disruption as the equipment need to be switched off due to safety reasons and prevention of further equipment damage. The use of submersible equipment and accessories has been identified as one of the mitigation methods to ensure continuous electrical supply during flood events. A research project was undertaken to develop the design criteria of the selection of submersible equipment and accessories as well as to develop the test method and evaluate the selected submersible equipment and accessories in a substation configuration. All the equipment could continuously operate in ON condition during the wet test. However, design improvements are suggested for the submersible switchgear and feeder pillar for better performance during and after flood events.

Copyrights © 2017






Journal Info

Abbrev

TELKOMNIKA

Publisher

Subject

Computer Science & IT

Description

Submitted papers are evaluated by anonymous referees by single blind peer review for contribution, originality, relevance, and presentation. The Editor shall inform you of the results of the review as soon as possible, hopefully in 10 weeks. Please notice that because of the great number of ...