EVALUASI WAKTU KERJA EFEKTIF ALAT GALI MUAT EXCAVATOR HITACHI ZX-350 H DAN KOMATSU PC 200 DALAM RANGKA MENCAPAI TARGET 80.000 TON PADA PENAMBANGAN BATU ANDESIT DI PT. KOTO ALAM SEJAHTERA KABUPATEN 50 KOTA, PROVINSI SUMATERA BARAT

Rahmahtul Fadlillah (Universitas Negeri Padang)
Adree Octova (Universitas Negeri Padang)



Article Info

Publish Date
17 Feb 2021

Abstract

Abstract. In andesite mining, PT. Koto Alam Sejahtera uses a series of work, namely using a digging and loading equipment to move material from the loading point to the dump hopper. Based on the results of field observations, the authors found that the actual data obtained were not in accordance with the target set by the company that the production target was not achieved due to several factors, including due to lost time and delay of the digging equipment, planned and not achieved production targets. As it should be, productive work time is not optimal. There are still frequent inconsistencies in work between the digging and loading equipment, where the digging tool often waits. This is due to the low actualization of working time against the productive time of the loading and transportation means, which causes a decrease in the efficiency of the work of the tools caused by various kinds of obstacles in the field that can actually be avoided.Keywords: excavator, Production, Effective Working Hours, Evaluation

Copyrights © 2021






Journal Info

Abbrev

mining

Publisher

Subject

Earth & Planetary Sciences

Description

Atas dukungan dari jurusan Teknik Pertambangan dengan Penanggung Jawab Dekan Fakultas Teknik UNP (Drs. Ganefri,MPd, P.hd) bekerjasama dengan Ketua Jurusan Teknik Pertambangan (Drs.Bambang Heriyadi,MT) dan seluruh Dosen Jurusan Teknik Pertambangan Fakultas Teknik Universitas Negeri Padang. Jurnal ini ...