Optimalisasi Produktivitas Batu Andesit Menggunakan Metode Quality Control Circle Untuk Memenuhi Target Produksi Batu Andesit 18.000 ton/bulan Pada PT Pebana Adi Sarana Nagari Manggilang Kec. Pangkalan Koto Baru Kab. Lima Puluh Kota, Provinsi Sumatera Barat

Rani anggraini (Unknown)
Adree Octova (Universitas Negeri Padang)



Article Info

Publish Date
26 Sep 2024

Abstract

Abstract. PT Pebana Adi  Sarana is a company engaged in andesite mining located in Lima Puluh Kota Regency. Andesite mining activities are carried out using the quarry mining method.PT Pebana Adi Sarana has a constant mounly production target of 18.000 tons/month. However, the realization of production for the august-september 2020 period was not achieved, namely ar 15.215,33 tons/month. Where the production achieved is only 84,5% og the target set by the company.This study uses the QCC method to increase production based on a paretto analisys of the main problem and the dominant cause of the not optimal production of minning equipment is 47% while on the conveyance 42% of the avaible working time. By making improvements to the working tim wasted with the QCC menthod the productivity increased to 44% for loading equipment and tranportation equipment bu 38% from the actual productivity. After encreasing the time wasted to be 93,79 hours/month for digging tolls and 81,09 hours/mont foe comveyances.Keywords : Excavator, DT Scannia, Productivity, Quality Control Circle, Paretto, Fishbone

Copyrights © 2020






Journal Info

Abbrev

mining

Publisher

Subject

Earth & Planetary Sciences

Description

Atas dukungan dari jurusan Teknik Pertambangan dengan Penanggung Jawab Dekan Fakultas Teknik UNP (Drs. Ganefri,MPd, P.hd) bekerjasama dengan Ketua Jurusan Teknik Pertambangan (Drs.Bambang Heriyadi,MT) dan seluruh Dosen Jurusan Teknik Pertambangan Fakultas Teknik Universitas Negeri Padang. Jurnal ini ...