Construction and Material Journal
Vol. 2 No. 3 (2020): Construction and Material Journal Vol. 2 No. 3 November 2020

PENGENDALIAN MUTU STRUKTUR PADA PROYEK RUMAH SUSUN STASIUN PONDOK CINA

Betty Rosyana Manurung (Jakarta State Polytechnic)
Sidiq Wacono (Jakarta State Polytechnic)



Article Info

Publish Date
25 Feb 2021

Abstract

Each project can run well and achieve results as planned is expected undoubtedly. Therefore, it requires project quality control. The quality control system in construction projects is essential must be carried out to produce one-time work of a quality that meets the specified standards. This study aims to determine the quality control system for superstructure work and to determine whether the quality of reinforced concrete is according to the requirements. The data used is secondary data, namely, data directly obtained from the project. The data used are tthe concrete compressed test result and reinforcing steel tests held in the laboratory and reinforced concrete data. The analysis results showed that the compress strength of concrete for FC 30 and FC 40 with a test age of 28 days was by the specified requirements, the reinforcement tests S10, S13, S16, S19, S22, S25 meet requirements. For the final result, reinforced concrete found a few defects, but the contractor immediately took corrective action. The analysis shows the implementation of an appropriate quality control process in this project. Keywords : Quality, Control, Concrete, Reinforcement, Construction.

Copyrights © 2020






Journal Info

Abbrev

cmj

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Jurnal Construction And Material adalah jurnal Teknik Sipil yang mencakup bidang keahlian Dasar Teknik, Struktur, Material, Manajemen Konstruksi, Tata Laksana, Transportasi, Sumber Daya Air dan Lingkungan, Geoteknik, Pengukuran dan Jalan Raya. Jurnal ini diperuntukkan bagi mahasiswa, pengajar, dan ...