Journals Mining Engineering : Bina Tambang
Vol 6, No 3 (2021): Journals Mining Engineering: Bina Tambang

Optimalisasi Produksi Batubara Pada Proses Coal Getting di Pit 3 PT. Jambi Prima Coal, Kecamatan Mandiangin, Kabupaten Sarolangun, Provinsi Jambi

Rico Fernandes (Universitas Negeri Padang)
Dedi Yulhendra (Universitas Negeri Padang)



Article Info

Publish Date
26 Sep 2024

Abstract

PT. Jambi Prima Coal is a company engaged in coal mining, which is located in Pemusiran, Mandiangin, Sarolangun, Jambi. The coal production target in PIT 3 PT. Jambi Prima Coal is 20,000 tons /month In July 2019. In fact, coal production in July can only reach 89.25% of the total production target of 20,000 tonnes / month, coal production that can be produced is only 17,850 tonnes / month. Therefore it is necessary to conduct research using the Quality Control Cycle (QCC) to improve and optimize coal production. In this study, the required data are in the form of excavator and conveyance cycle time, field resistance, the number of mechanical devices used and the productivity of the dig and load equipment. The results of calculations using the Quality Control Cycle (QCC) method were carried out by increasing work efficiency, reducing loss time and improving working time so that the coal production obtained was 25,431.94 tons / month, which increased production by 37.9%. This production result shows that the improvements made have resulted in an increase in production yields from previous results.

Copyrights © 2021






Journal Info

Abbrev

mining

Publisher

Subject

Earth & Planetary Sciences

Description

Atas dukungan dari jurusan Teknik Pertambangan dengan Penanggung Jawab Dekan Fakultas Teknik UNP (Drs. Ganefri,MPd, P.hd) bekerjasama dengan Ketua Jurusan Teknik Pertambangan (Drs.Bambang Heriyadi,MT) dan seluruh Dosen Jurusan Teknik Pertambangan Fakultas Teknik Universitas Negeri Padang. Jurnal ini ...