Journal of Industrial Engineering
Vol 6, No 2 (2021)

Perbaikan Proses Bisnis Pembuatan Laporan Produksi Harian untuk Memperpendek Lead Time pada Perusahaan Manufaktur Mobil

Anastasia Lidya Maukar (President University)



Article Info

Publish Date
04 Oct 2021

Abstract

This research was conducted at a four-wheeled vehicle manufacturing company located in Jakarta. The average lead time for making the Plant 2 Daily Production Report is currently around 12 minutes. With the long reporting time, this process is considered less efficient. In this research, business process improvement will be carried out by identifying non value-added activities and using business process improvement methodology. In improving the reporting process, Excel Macros will be used. After the implementation of business process improvements, the average time for making Daily Production Reports is reduced to 4 minutes or there is a time saving of 67%.  

Copyrights © 2021






Journal Info

Abbrev

journalofIndustrialEngineerin

Publisher

Subject

Industrial & Manufacturing Engineering

Description

JIE: Journal of Industrial Engineering (Online ISSN: 2527-4139; Printed ISSN 2503-3670) is a scientific journal in the field of industrial engineering that publishes scientific writings on pure and applied research in industrial system, including (but not limited to): Production system, Inventory ...