Jurnal Teknik Industri
Vol. 19 No. 1 (2018): Februari

Improve Algoritma Hodgson Untuk Meminimasi Jumlah Job Terlambat Pada Penjadwalan Flow shop

Dian Setiya Widodo (Teknik Manufaktur, Politeknik 17 Agustus Surabaya Jl. 45, Gedung N&P, Semolowaru, Sukolilo, Surabaya, Jawa Timur 60118)



Article Info

Publish Date
27 Feb 2018

Abstract

Since Johnson published a paper in 1954, the problem of job scheduling has received the attention of hundreds of practitioners and researchers, as one of the most studied topics in Operation research. Several heuristic studies have discussed the problem of flow shop scheduling to minimize the completion time (makespan). In this paper, we consider the problem of pure flow shop scheduling to minimize the number of jobs of tardy. We have developed a Hudson algorithm for minimization solution the number jobs of tardy. Hodgson's improved Heuristic algorithm was tested and compared to the EDD priority rule. The Numerical experimental results show the new algorithm provides a better solution than priority EDD. The improving Hodgson algorithm gives a minimum number of tardy jobs.

Copyrights © 2018






Journal Info

Abbrev

industri

Publisher

Subject

Decision Sciences, Operations Research & Management Economics, Econometrics & Finance Industrial & Manufacturing Engineering

Description

Dr. Saiful Anwar Malang is a state hospital has done it is job and function, but in 3rd class of pavilion room, the number of patient decrease dramatically. It is concerned with quality of this hospital. To answer this problem, research was done using Quality Function Deployment (QFD). Quality ...