Journal of Industial Engineering and Technology
Vol 1, No 2 (2021): Juni 2021

ANALISA PERBANDINGAN PENJADWALAN PRODUKSI DENGAN METODE CDS (CAMPBELL DUDEK SMITH), EDD (EARLIEST DUE DATE) DAN FCFS (FIRST COME FIRST SERVE) PADA PT. SARI WARNA ASLI UNIT V

Dwi Ayu Lestari, Vikha Indira Asri (Universitas Muria Kudus)



Article Info

Publish Date
04 Oct 2021

Abstract

Scheduling is defined as the process of sequencing the manufacture of a product as a whole on several machines. All industries need proper scheduling to manage the allocation of resources so that the production system can run quickly and precisely as of it can produce optimal product. PT. Sari Warna Asli Unit V is one of the companies that implements a make to order production system with the FCFS system. Thus, scheduling the production process at this company is also known as job shop production scheduling. The methods used in this research are the CDS method, the EDD method and the FCFS method. The purpose of this research is to minimize the production time and determine the best method that can be applied to the company. The results of this research showed that the makespan obtained in the company's scheduling system with FCFS rules was 458 minutes, and the results of scheduling using the CDS method obtained a makespan value of 329 minutes, then the best production scheduling method that had the smallest makespan value was the CDS method.

Copyrights © 2021






Journal Info

Abbrev

jointtech

Publisher

Subject

Decision Sciences, Operations Research & Management Industrial & Manufacturing Engineering

Description

Journal of Industrial Engineering and Technology adalah jurnal ilmiah peer-reviewed dan open access yang bertujuan untuk mendiseminasi/menyebarluaskan perkembangan technology penelitian di bidang keilmuan Teknik Industri. Ruang Lingkup Journal of Industrial Engineering and Technology adalah mencakup ...