Jurnal Ilmiah Teknik Industri
Vol. 4, No. 2, Desember 2005

PENGEMBANGAN ALGORITMA PENJADUALAN PRODUKSI JOB SHOP UNTUK MEMINIMUMKAN TOTAL BIAYA EARLINESS DAN TARDINESS

Dian Retno Sari Dewi (Jurusan Teknik Industri, Universitas Katolik Widya Mandala Surabaya, Jl. Dinoyo no. 22 – 24, Surabaya)



Article Info

Publish Date
30 Dec 2005

Abstract

This paper develops job shop production scheduling using Non Delay algorithm through forward and backward-forward algorithm to minimize total earliness and tardiness costs. Backward approach has some disadvantages, such as, if the job is scheduled in backward, there is a possibility that the infeasible situation occurs, in which the job is scheduled at t0. This paper used hypothetic data generated randomly. This job shop scheduling algorithm development was validated using LINDO software to check the effectiveness heuristic method, compared with the optimation method. The validation proves that the result of backward-forward scheduling method is better than the result of forward scheduling method.

Copyrights © 2005






Journal Info

Abbrev

jiti

Publisher

Subject

Industrial & Manufacturing Engineering

Description

Jurnal Ilmiah Teknik Industri is a scientific journal that aims to participate in developing the scientific field of Industrial Engineering, contains the results of research and theoretical study from lecturers, researchers and industry practitioners. Jurnal Ilmiah Teknik Industri is administered by ...