Model Proyeksi Dan Optimalisasi Cash Flow Multi Proyek

Resela Irpiena (Magister Teknik Sipil)
Ratna Setyawardani Alifen (Magister Teknik Sipil Universitas Kristen Petra)
Herry Pintardi Chandra (Magister Teknik Sipil Universitas Kristen Petra)



Article Info

Publish Date
31 Oct 2016

Abstract

This study aims to create an integrated system that has the ability to project the schedule and cash flow of a multi project situation for construction companies, while optimizing them so that a more efficient schedule and financial planning is achieved. In this study, an efficient construction planning refers to a schedule combination that generates a cash flow with minimum overdraft for the company.This study focuses on utilizing floats from non-critical activities in initial or as-planned schedule. Iteration on the floats is done with evolutionary algorithm optimization method using projects’ durations and credit limit as constraints. The result is a combination of multi project schedules which generates the least amount of overdraft throughout the fiscal year to achieve minimum loans of thecompany.

Copyrights © 2016






Journal Info

Abbrev

duts

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Jurnal Dimensi Utama Teknik Sipil (DUTS) promotes the widest possible dissemination of civil engineering knowledge by encouraging researchers to conduct research, build new or extend existing theoretical foundations, and contribute to practice at the corporate and national level. We aim to improve ...