Journals Mining Engineering : Bina Tambang
Vol 6, No 3 (2021): Journals Mining Engineering: Bina Tambang

Analisis Kestabilan Lubang Bukaan Tambang Bawah Tanah Berdasarkan Klasifikasi Geomekanika (RMR-System) Site D.25 Lokasi III PT. Dasrat Sarana Arang Sejati, Parambahan, Desa Batu Tanjung, Kecamatan Talawi, Kota Sawahlunto

Ari Ardila (Unknown)
Bambang Heriyadi (Unknown)



Article Info

Publish Date
26 Sep 2024

Abstract

From the measurement of several parameters of the RMR method that has been carried out, at Site D.25 Location III for siltstone is in class III (fair rock) with an RMR value of 57 with Stand Up Time is 1200 hours or 50 days with a planned production advance hole width of 3 meters, and coal is in class III (fair rock) with an RMR value of 51 with a Stand Up Time of 600 hours or 25 days with a planned production advance pit width of 3 meters. Based on the RMR weighting data then: if using rock bolt (20 mm diameter fully grouted) with a length of 4 m and a spacing of 1.5-2 m on the walls and roof then add the installation of wire mesh, shotcrete thickness of 50-100 mm on the roof and 30 mm on the wall. If using wood reinforcement, then for the reinforcement of the opening holes, a recommendation for a support system that should be applied to optimize the support to be safe and profitable is obtained, namely with a wood diameter of 20 cm, a distance between supports of 1.5 m and FK 1.5.

Copyrights © 2021






Journal Info

Abbrev

mining

Publisher

Subject

Earth & Planetary Sciences

Description

Atas dukungan dari jurusan Teknik Pertambangan dengan Penanggung Jawab Dekan Fakultas Teknik UNP (Drs. Ganefri,MPd, P.hd) bekerjasama dengan Ketua Jurusan Teknik Pertambangan (Drs.Bambang Heriyadi,MT) dan seluruh Dosen Jurusan Teknik Pertambangan Fakultas Teknik Universitas Negeri Padang. Jurnal ini ...