Analisis Keterlambatan Proyek Konstruksi di PT. PLN (Persero) UIP Sumbagut

Irwan Irwan (Universitas Medan Area)
Melloukey Ardan (Universitas Medan Area)
Nuril Mahda Rangkuti (Universitas Medan Area)
Febrina Monalisa (Universitas Medan Area)



Article Info

Publish Date
01 Mar 2022

Abstract

Project delays are the main contribution to project cost overruns. The research intends to determine the main factor that cause delays in construction projects at PT. PLN (PERSERO) UIP Sumbagut. In this research, there were 31 variables which were grouped into 6 categories. The research is done by distributing questionnaires to 20 respondents from the owner who also handles the project. The data analysis used a comparison of the percentage, rank mean and standard deviation which were analyzed with Statistical Product and Service Solutions (SPSS). Based on the results of data analysis, it was found that the main factor causing delays in construction projects at PT. PLN (PERSERO) UIP Sumbagut is a shortage of manpower to complete a project. In addition, there are several other dominant factors, namely labor qualifications that do not meet standards; difficulties in financial cash flow and project funding from contractors; scheduling conflicts with sub-contractors and suppliers in the completion of work; security disturbances during the project.

Copyrights © 2022






Journal Info

Abbrev

jcebt

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Jurnal JCEBT Program Studi Teknik Sipil merupakan jurnal ilmiah yang diterbitkan berkala setiap 6 bulan, yaitu Maret dan September. Jurnal JCEBT Program Studi Teknik Sipil diterbitkan untuk pertama kalinya pada tahun 2017 dengan membawa misi sebagai salah satu pelopor dalam penerbitan media ...