Jurnal Teknik Industri
Vol. 3 No. 2 (2002)

Perencanaan Persediaan Suku Cadang (Spare Part) Mesin Tenun Sulzer Ruti Berdasarkan Analisis Keandalan

Teguh Baroto (Unknown)
Tutik Solikhati (Unknown)



Article Info

Publish Date
26 Apr 2010

Abstract

Availability of machine spare parts is very supporting f or maintenancea ctivity conductedin order to improve the machine performance. So far, PT. Eratex Djaja often have difficulty inananging component stock particularly critical component of Sulzer Ruti machine, so it isnecesiary to deie.-ine theo ptimums tockc onditionto minimizer esultedc ost. In this researcwh ewill utilize probabiliticasl tockm odelw ith fixed amounto f order (Q systemm odel)i n ordert omake average stock in storage as low as possible considering quite high price of the criticalcomponent. In addition to this, it is also required that level of component availability ismaximized.B asedo n the stock model,w e are ablet o approachth e componenta mountr equiredf ora givenp eriodb y assumingc onsta.natv eraged efectr ate.F rom the lesealchc anb e conlusedth atthe numbero f componentms ustb e requiredf or quidet oothb lock assimetrical:6, upper meanbrake lining blue : 10, lower brake lining blue : 12, and upper front brake lining blue =15

Copyrights © 2002






Journal Info

Abbrev

industri

Publisher

Subject

Decision Sciences, Operations Research & Management Economics, Econometrics & Finance Industrial & Manufacturing Engineering

Description

Dr. Saiful Anwar Malang is a state hospital has done it is job and function, but in 3rd class of pavilion room, the number of patient decrease dramatically. It is concerned with quality of this hospital. To answer this problem, research was done using Quality Function Deployment (QFD). Quality ...