Jurnal Teknik Industri
Vol. 1 No. 2 (2000)

Perencanaan Jadwal Induk Produksi Dengan Menggunakan Metode Disagregat Guna Memenuhi Permintaan Yang Berfluktuasi

Eti Kristinawati (Unknown)



Article Info

Publish Date
29 Apr 2010

Abstract

Every company always tries to serve all customer's demand. This need a good planning and schedulling to keep flow production. PT Binarenata is one company which produce many kind of metal products. Currently, this company has problem in material handling of product and lack of another product. To solve this problem, this company made Master Produclion Schedule using disagregat method to duet he fluctuation demand. From analysis data can be found the number of worker with minimum cost in the next production planning is about 966 persons with cost about Rp. 49.431.714.000,00. Implementing this Master Production Schedule can reduce production cost about Rp. 5.829.363.807,00 or 76,3 %

Copyrights © 2000






Journal Info

Abbrev

industri

Publisher

Subject

Decision Sciences, Operations Research & Management Economics, Econometrics & Finance Industrial & Manufacturing Engineering

Description

Dr. Saiful Anwar Malang is a state hospital has done it is job and function, but in 3rd class of pavilion room, the number of patient decrease dramatically. It is concerned with quality of this hospital. To answer this problem, research was done using Quality Function Deployment (QFD). Quality ...