Perencanaan Scheduling dan Rescheduling dengan Metode Heuristic SPT Guna Meminimumkan Mean Tardiness dan Makespan

Eti Kristinawati (Unknown)



Article Info

Publish Date
26 Apr 2010

Abstract

To complete customer's demand so company must make a plan with using production schedule. Some diffrculties usually happen in shop floor level is a new job which is put in a production schedule that have arranged before. So that the old production schedule have to revised by reschedulling. The procedure that be used to schedule the real time production consist of n job m machine is algoritm of Hueristik Dispatching Rule Shorted Processing Time (SPT) method to minimize mean tardiness and makespan.

Copyrights © 2002






Journal Info

Abbrev

industri

Publisher

Subject

Decision Sciences, Operations Research & Management Economics, Econometrics & Finance Industrial & Manufacturing Engineering

Description

Dr. Saiful Anwar Malang is a state hospital has done it is job and function, but in 3rd class of pavilion room, the number of patient decrease dramatically. It is concerned with quality of this hospital. To answer this problem, research was done using Quality Function Deployment (QFD). Quality ...