Jurnal Rekavasi
Vol 10 No 1 (2022)

IMPLEMENTASI METODE SIX SIGMA DALAM PENETAPAN STRATEGI PENINGKATAN KUALITAS JASA PERBAIKAN TURBIN

Azmi Anwar Sidik (INTITUT TEKNOLOGI NASIONAL BANDUNG)
Caecilia Sri Wahyuning (Institut Teknologi Nasional Bandung)



Article Info

Publish Date
31 May 2022

Abstract

Companies that are involved in turbine repair service and maintenance often suffered from delayed work, which affected customer satisfaction and trust. Six-Sigma method is used to solve the delay issue. According to the research result, it is found that the capability of servicing process of a turbine in this company is 1.346s with DPMO of 560810.8. This condition is categorised as low, below the industry average in Indonesia of 2s with DPMO of 308.538. The main cause of the delay is with the unreliable work-hour prediciton, unreliability and unavailability of materials from suppliers, failure of the machines, and flawed scheduling. It is suggested to improve the service by work measurment to help predict the needs for repair schedule, rectifying the supply and maintenance system, as well as scheduling system according to the demands of repair service, repair time prediction, and the repair schedule of the machine itself

Copyrights © 2022






Journal Info

Abbrev

rekavasi

Publisher

Subject

Computer Science & IT Engineering Industrial & Manufacturing Engineering

Description

Jurnal Rekavasi merupakan open acces journal yang diterbitkan Prodi Teknik Industri, Institut Sains & Teknologi AKPRIND Yogyakarta. Jurnal ini diterbitkan 2 (dua) kali dalam setahun, setiap bulan Mei dan ...