Journal of Green Science and Technology
Vol 1, No 1 (2017): Journal of Green Science and Technology

MANAGEMENT ANALYSIS OF CONSTRUCTION PROJECT CIPAGER CHECK DAM OF KUNINGAN REGENCY

Dian Indra Rosdiana (UNIVERSITAS SWADAYA GUNUNG JATI)
Saihul Anwar (UNIVERSITAS SWADAYA GUNUNG JATI)



Article Info

Publish Date
28 Feb 2018

Abstract

Project management is one important aspect in the application of knowledge, expertise and skills to achieve the goals or objectives that have been determined in order to obtain optimum results in terms of performance, time, quality and safety.This study was conducted to analyze the Check Dam Project Construction Management Cipager River Kuningan start of calculating volume,implementation works, supplies (tools, labor, materials)budget plan, method, barchart, s curve, analysis critical path method and cash flow.          The results showed that the budget plan costs incurred to complete the CipagerCheck Dam RiverOf Kuningan RegencyRp. 6.140.922.000,00(Six billion one hundred forty million Nine hundred twenty two thousand rupiah) including 10% VAT. Then by using analysis critical path method, completion takes as long as 25 weeks, or 175 calendar days.

Copyrights © 2018






Journal Info

Abbrev

JGST

Publisher

Subject

Chemical Engineering, Chemistry & Bioengineering Civil Engineering, Building, Construction & Architecture Electrical & Electronics Engineering Engineering Industrial & Manufacturing Engineering

Description

Journal of Green Science and Technology (JGST) published since 2018 by Faculty of Engineering Universitas Swadaya Gunung Djati (UGJ) Cirebon with p-ISSN 2598-1277 and e-ISSN 2621-3966. JGST is a peer reviewed journal published triannualy in January, April, and September. ...