Jurnal Inovasi Pertambangan dan Lingkungan
Vol 1, No 1 (2021): Jurnal Inovasi Pertambangan dan Lingkungan

Analisis Geometri Peledakan Untuk Mendapatkan Hasil Fragmentasi dan Digging Time Optimal di Pit North Tutupan PT. SIS site Adaro (PT. Adaro Indonesia)

Ahmad Erlangga Adji (Technische Universität Clausthal)
M Bambang Soegeng (UIN Syarif Hidayatullah Jakarta)
A Silvan Erusani (UIN Syarif Hidayatullah Jakarta)



Article Info

Publish Date
10 Jun 2021

Abstract

Blasting activity is really important thing to support production achievement in mine. Especially on drilling and blasting production. Good drilling also will affect the fragmentation outcome. Geometry applications have to conductbased on rock characteristics in every blasting location. In this case, correlation between burden and spacing in blasting geometry, how powder factor impact to fragmentation and also digging time excavator. The impact of change geometry blasting will result the appropriate digging time from fragmentation. PT. SIS digging time target is 12 seconds for all different classes of excavators. Hence, it is expected that the acquisition of digging time is reached. Thus, the production process will be influenced.Keywords - Geometry, Fragmentation, and Digging Time

Copyrights © 2021






Journal Info

Abbrev

jipl

Publisher

Subject

Engineering Environmental Science Materials Science & Nanotechnology

Description

Jurnal Inovasi Pertambangan dan Lingkungan is a journal published by Mining Engineering Department, Faculty of Science and Technology, UIN Syarif Hidayatullah Jakarta. The journal aims to disseminate cutting-edge research in all areas of mining engineering both theoretical and experimental studies. ...