STRING (Satuan Tulisan Riset dan Inovasi Teknologi)
Vol 7, No 1 (2022)

Optimalisasi Waktu Kerja Karyawan Menggunakan Metode Hungarian (Studi Kasus CV Bintang Jaya)

Wulan Raisa Nabila (Universitas Singaperbangsa Karawang)
Dene Herwanto (Universitas Singaperbangsa Karawang)
Winda Rana Zahra (Universitas Singaperbangsa Karawang)



Article Info

Publish Date
05 Aug 2022

Abstract

The most common problem in business and industry today is the optimal allocation of production resources, i.e. providing different levels of productivity in different tasks. The challenge of CV Bintang Jaya is how to optimize working hours according to the working hours of its employees. The purpose of this study is to determine the working time of employees in accordance with the work. The research method used is hungarian using the POM-QM application for Windows. Data are collected through observation, interviews, documentation and literature study. From this study, the best results are obtained based on the work. Employee 1 takes 17 minutes to perform the wood cutting operation, employee 2 takes 35 minutes to make a pattern, employee 3 takes 10 minutes to perform the smoothing operation, and employee 4 takes 10 minutes to perform the assembly operation.

Copyrights © 2022






Journal Info

Abbrev

STRING

Publisher

Subject

Computer Science & IT Mathematics

Description

STRING (Satuan Tulisan Riset dan Inovasi Teknologi) focuses on the publication of the results of scientific research related to the science and technology. STRING publishes scholarly articles in Science and Technology Focus and Scope Covering: 1. Computing and Informatics 2. Industrial Engineering ...