Journal Industrial Manufacturing
Vol 7, No 2 (2022): Journal Industrial Manufacturing

Pengendalian Persediaan Material Heel Counter A1004 Pada Sepatu Predator P2-P3 Family Dengan Metode Material Requirement Planning (Studi Kasus di Perusahaan Sepatu)

Hartono, Hartono (Unknown)
Carelio, Wuquf Octavian (Unknown)



Article Info

Publish Date
23 Sep 2022

Abstract

Raw materials are a very important point for a company. Raw materials owned by a company to support the smooth production process, because with good raw material management will be able to save raw material costs so as to minimize costs. All shoe models are developed in advance in the Development department using the required materials and components according to the concept from Adidas as their buyer. In the supply of materials, the Development department purchases the Heel Counter (HC) A1004 in pairs and in its use, there is often a shortage of stock on the Predator P2 and P3 models in size 6T, resulting in delays in making shoes for delivery to Adidas. This study aims to determine the analysis of material inventory with the Material Requirement Planning (MRP) method so that there is no shortage of stock again. This study uses lot sizing EOQ and POQ techniques, Safety Stock, Re-order Point and looking for ordering frequency in order to solve the problem of existing stock shortages. The results showed that orders made to avoid stock shortages were ordering using the POQ method with an average purchase of 140 pairs per purchase, 41 pairs of safety stock, 71 pairs of re-order points and frequency order once a month. Keywords : MRP, EOQ, POQ, Safety Stock, ROP, Frequency

Copyrights © 2022






Journal Info

Abbrev

jim

Publisher

Subject

Engineering Industrial & Manufacturing Engineering

Description

Journal of Industrial Manufacturing merupakan jurnal ilmiah yang berfokus terhadap continuous improvement dalam dunia industri (maufaktur dan jasa). Selain itu ruang lingkup jurnal mencakup seluruh keilmuan Teknik ...