Industrial Engineering Online Journal
Vol 11, No 4 (2022): WISUDA PERIODE OKTOBER TAHUN 2022

OPTIMASI PRODUKTIVITAS PROSES PRODUKSI (LINE FILLING) PRODUK PUTTY MENGGUNAKAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA PT. XYZ

Bimantoro Suryo Wibowo (Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro, Jalan Prof. Soedarto, SH, Semarang, Indonesia 50275)
Novie Susanto (Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro, Jalan Prof. Soedarto, SH, Semarang, Indonesia 50275)



Article Info

Publish Date
28 Sep 2022

Abstract

Abstrak PT. XYZ merupakan suatu perusahaan yang bergerak di bidang industri manufaktur cat mobil, berbagai jenis cat mobil dan seluruh komponen yang dibutuhkan untuk melakukan proses pengecatan diproduksi oleh perusahaan ini. Tujuan dari penelitian ini adalah untuk mengoptimasi proses produksi produk putty kemasan tube dengan benchmarking berupa Overall Equipment Effectiveness (OEE) yang dihasilkan selama proses filling putty kemasan tube berlangsung dapat melampaui target yang sudah ditetapkan oleh perusahaan, apabila hal tersebut terjadi maka proses filling putty kemasan tube sudah dikategorikan optimal. Proses filling putty kemasan tube tersebut dapat optimal dengan adanya standardisasi waktu downtime yang timbul selama proses filling putty kemasan tube berlangsung. Kata Kunci : Optimasi; Produktivitas; OEE; Downtime Abstract Pt. XYZ is a company engaged in the car paint manufacturing industry, various types of car paint and all components needed to carry out the painting process are produced by this company. The purpose of this study is to optimize the production process of tube packaging putty products by benchmarking in the form of Overall Equipment Effectiveness (OEE) produced during the tube packaging putty filling process, which can exceed the target set by the company, if this happens, the tube packaging putty filling process has been categorized as optimal. The tube packaging putty filling process can be optimal with the standardization of downtime that arises during the tube packaging putty filling process. Keywords : Optimization; Productivity; OEE; Downtime

Copyrights © 2022






Journal Info

Abbrev

ieoj

Publisher

Subject

Industrial & Manufacturing Engineering

Description

INDUSTRIAL ENGINEERING ONLINE JOURNAL adalah Karya Ilmiah S1 Program Studi Teknik Industri Fakultas Teknik Universitas Diponegoro yang memuat tulisan ilmiah dan hasil-hasil penelitian, kajian ilmiah, analisis dan pemecahan permasalahan di Industri yang erat hubungannya dengan bidang Ilmu Teknik ...