Jurnal Rekavasi
Vol 10 No 2 (2022)

Persediaan Spare Part Menggunakan Reliability Centered Spares Dan inventory Analysis Di CV. selorejo Bantul

Aprilia Hardiyanti (Unknown)
Sodikin, Imam (Unknown)
Khasanah, Rahayu (Unknown)



Article Info

Publish Date
30 Dec 2022

Abstract

The results obtained from the RCS worksheet show that there is 1 unit of high critical category component, 10 units of medium critical category component and 4 units of low critical category component. Calculation of component requirements for the next 12 months using the Poisson process obtained the total requirement for 4 months of critical component spare parts to be able to meet 95% availability of v-belt mixers is 7 units (12 months = 21 units), hydraulic rubber requires 4 units (12 months=12 units), and vibrating v-belt system requires 2 units (12 months = 6 units). Order size and costs incurred for 4 months for 7 units of v-belt mixer component spare parts of IDR 569,500 (12 months = IDR 1,708,500), 4 units of hydraulic rubber components IDR 653,800 (12 months = IDR 1,961,400) and a v-belt system component of 2 units of IDR 103,300 (12 months = IDR 309,900). The total inventory cost for the 12 months that the company has to pay for the three critical component spare parts is IDR 3,979,800.

Copyrights © 2022






Journal Info

Abbrev

rekavasi

Publisher

Subject

Computer Science & IT Engineering Industrial & Manufacturing Engineering

Description

Jurnal Rekavasi merupakan open acces journal yang diterbitkan Prodi Teknik Industri, Institut Sains & Teknologi AKPRIND Yogyakarta. Jurnal ini diterbitkan 2 (dua) kali dalam setahun, setiap bulan Mei dan ...