eProceedings of Engineering
Vol 8, No 5 (2021): Oktober 2021

Pt Rti Production Division Manpower Planning Based On Workload Analysis Using Work Sampling Method

Alfian Kusuma Aji (Telkom University)
Atya Nur Aisha (Telkom University)
Yussi Perdana Saputera (Telkom University)



Article Info

Publish Date
01 Oct 2021

Abstract

Human resources have a role to support the realization of the company's strategic plan and increase company productivity. In the last three years PT RTI can’t fulfill the demand target on time and also due to the lack of manpower, causing the workload in the production division to increase. Workload analysis and manpower planning will be done by using work sampling method. Result of calculation is a standard time that can be used for the manpower planning. The results of the workload analysis show that the workload limit control is from 107,96% to 126,62%. The workload for each job is as follows: Designer (107,11% - Underload), Mechanic (145,59% - Overload), System Developer (118,61% - Optimal), Quality Control Staff (98,46% - Underload). The manpower planning needed in the company are one designer, five mechanics, three system developers and one quality control staff. Keywords : manpower planning, work sampling, workload

Copyrights © 2021






Journal Info

Abbrev

engineering

Publisher

Subject

Computer Science & IT Control & Systems Engineering Electrical & Electronics Engineering Engineering Industrial & Manufacturing Engineering

Description

Merupakan media publikasi karya ilmiah lulusan Universitas Telkom yang berisi tentang kajian teknik. Karya Tulis ilmiah yang diunggah akan melalui prosedur pemeriksaan (reviewer) dan approval pembimbing ...