The role of time and cost control in CPM, PERT, and EVA methods in construction projects: A meta-analysis study on evaluating project performance

Ramdani, E W P (Unknown)
Tutuko, P (Unknown)
Budiyanto, H (Unknown)
Susanto, Susanto (Unknown)



Article Info

Publish Date
18 Apr 2022

Abstract

Time and cost efficiency without reducing quality is something that construction service providers always want to achieve in the implementation of project completion. Project work will be limited by cost and time in completion. Methods of controlling time and costs can assist the Project Manager in evaluating project performance and taking actions needed to achieve project objectives. This study is about the comparison of research articles that have been published previously using Meta-Analysis Review which aims to compare three methods that are often used in controlling time and cost, namely CPM (Critical Path Method), PERT Method (Project Evaluation Review Technique), and EVA Method (Earned Value Analysis). The results obtained from the review of this article that each method of controlling costs and time has advantages and disadvantages following their respective characteristics, with that we can know differences of each method. The study found that experience from the Project Manager is needed to choose the right method for implementing project work.

Copyrights © 2022






Journal Info

Abbrev

aet

Publisher

Subject

Automotive Engineering Civil Engineering, Building, Construction & Architecture Computer Science & IT Electrical & Electronics Engineering Industrial & Manufacturing Engineering Materials Science & Nanotechnology

Description

Applied Engineering and Technology provides a forum for information on innovation, research, development, and demonstration in the areas of Engineering and Technology applied to improve the optimization operation of engineering and technology for human life and industries. The journal publishes ...