Applied Engineering and Technology
Vol 1, No 2 (2022): August 2022

Developing a delay risk model for toll road construction project: A conceptual framework

Pratama, G A (Unknown)
Latief, Y (Unknown)



Article Info

Publish Date
19 Apr 2022

Abstract

In the realization of the medium-term development plan in 2014-2019 (RPJMN), toll road construction development was only reached 51 percent. construction projects had complex and dynamic nature, which caused delays, construction risk assessment that considers risk as a system was done before, for example, using techniques such as SD, Fuzzy DEMATEL, STEEP-SD, DEMATEL-ANP, and SD-DEMATEL, but the technique still has some shortcomings. in indonesia, research related to this matter is still rarely done, to address this concern, we propose a conceptual framework that can be used to develop a delay risk model for toll road construction project especially in indonesia. for this purpose, we introduce the system dynamic-fuzzy dematel-anp (sd-fdanp) method. the results of the development of the sd-fdanp method can be used as a guideline that can help achieve behavioral knowledge of delays and the success of risk assessment in toll road infrastructure development projects.

Copyrights © 2022






Journal Info

Abbrev

aet

Publisher

Subject

Automotive Engineering Civil Engineering, Building, Construction & Architecture Computer Science & IT Electrical & Electronics Engineering Industrial & Manufacturing Engineering Materials Science & Nanotechnology

Description

Applied Engineering and Technology provides a forum for information on innovation, research, development, and demonstration in the areas of Engineering and Technology applied to improve the optimization operation of engineering and technology for human life and industries. The journal publishes ...