Peringkat Dan Penanganan Risiko Dominan Konstruksi Design And Build Jalan Tol Pada Pekerjaan Proyek Trans Sumatera Ruas Simpang Indralaya–Muara Enim Seksi Simpang Indralaya – Prabumulih

Auzan Nurtsani, Rifqi (Unknown)



Article Info

Publish Date
18 Apr 2023

Abstract

 Prabumulih used thirty variables from the results of previous research which were then validated with experts and became a total of thirty-three variables. On these variables, interviews were conducted with respondents. The interview results were analyzed using spss and ranked based on the risk analysis. The results are then thrown back to the respondents for category risk mitigation (unacceptabrle). From these results, there are seven dominant risks. From these results, there are seven dominant risks. The dominant risk is divided into three categories, namely owner factors, implementing team factors and external factors that affect the Construction Design And Build of Toll Roads in Trans Sumatra Project Work Simpang Indralaya – Muara Enim Section Simpang Indralaya – Prabumulih Section  

Copyrights © 2023






Journal Info

Abbrev

etnik

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Economics, Econometrics & Finance Electrical & Electronics Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

ETNIK : Jurnal Ekonomi dan Teknik provides a means for ongoing discussion of the relevant issues that fall within the focus and scope of the journal that can be examined empirically. This journal publishes research articles in the Economic History, Applied Economics, Business and Finance, ...