Jurnal Eksakta Kebumian
Vol. 2 No. 3 (2021): JURNAL EKSAKTA KEBUMIAN (JEK)

PERENCANAAN DAN PERBANDINGAN DESAIN ESP MAKSIMAL DAN DESAIN POMPA TERSEDIA PADA SUMUR KSA-05

Kezia Sarah A. Siallagan (FTKE, Universitas Trisakti)



Article Info

Publish Date
01 May 2023

Abstract

AbstrakPT Pertamina EP Asset 3 Cirebon merupakan salah satu dari lima asset PT Pertamina EP dan Lapangan Bango Dua merupakan salah satu lapangan produksinya. Sumur KSA-05 merupakan sumur yang berada di daerah produksi Lapangan Bando Dua. Ketiga sumur tersebut akan menggunakan sistem pengangkatan buatan (Artificial Lift) berupa ElectricSubmersible Pump. Sumur- sumur tersebut akan dilakukan perencanaan dalam pemakaian pompa Electric Submersible Pump guna mendapatkan tipe pompa yang tepat untuk memaksimalkan produksinya. Sumur KSA-05 mempunyai water cut95 % sehingga pembuatan kurva Inflow Performance Relationship menggunakan IPR Wiggins. Dari hasil perhitungan didapat laju alir maksimumnya sebesar 7667.9 BFPD dan laju alir yang digunakan untuk melakukan perencanaan ulang pompa sebesar sekitar 73 % dari laju alir maksimum yaitu 6071 BFPD. Sumur KSA-05 dengan laju alir 6071 BFPD menggunakan pompa S6000N, 538 Single Stages, 3500 RPM, 60 Hz; 71 stages; motor seri 562, (210 HP/ 34 A / 3720 V); kabel Redamax AWG1; transformer 260 KVA, 0.01 – 120 Hz. Untuk melakukan perencanaan pompa dengan pompa tersedia sebesar sekitar 35 % dari laju alir maksimum yaitu 2683 BFPD hal ini juga di koreksi dengan metode Turpin Correlation. Sumur KSA-05 dengan laju alir 2683 BFPD menggunakan pompa D2400N, 400 Single Stages, 3500 RPM, 60 Hz; 71 stages; motor seri 456, (50 HP/ 27.5 A / 1400 V); kabel Redamax AWG1; transformer 83 KVA, 0.01 – 120 Hz. Kata kunci : ESP, IPR. AbstractPT Pertamina EP Asset 3 Cirebon is one of the five assets of PT Pertamina EP and Bango Dua Field is one of its production fields. KSA-05 well are well in the production area of Bango Dua Field. The wells will use Artificial Lift systems in the form of Electric Submersible Pump. The wells will be planned in the use of Electric Submersible Pump to get the right type of pump to maximize production.The KSA-05 well has a 95% water cut so that the Inflow Performance Relationship curve uses IPR Wiggins. From the calculation results, the maximum flow rate is 7667.9 BFPD and the flow rate used to re-plan the pump is around 73% of the maximum flow rate of 6071 BFPD, this is also corrected by the Turpin Correlation method. KSA-05 well with flow rate 6071 BFPD using S6000N pump, 538 Single Stages, 3500 RPM, 60 Hz; 71 stages; series motor 562, (210 HP / 34 A / 3720 V); Redamax AWG1 cable; 260 KVA transformers, 0.01 - 120 Hz. To plan a pump with an available pump of about 35% of the maximum flow rate of 2683 BFPD this is also corrected by the Turpin Correlation method. KSA-05 well with a flow rate of 2683 BFPD using a D2400N pump, 400 Single Stages, 3500 RPM, 60 Hz; 71 stages; 456 series motorcycles (50 HP / 27.5 A / 1400 V); Redamax AWG1 cable; transformers 83 KVA, 0.01 – 120 Keywords : ESP, IPR.

Copyrights © 2021






Journal Info

Abbrev

jek

Publisher

Subject

Earth & Planetary Sciences Energy Materials Science & Nanotechnology

Description

Merupakan wadah untuk mempublikasikan karya tulis Teknik Perminyakan, Teknik Geologi dan Teknik Pertambangan. Karya tulis ilmiah yang dipublikasikan diharapkan dapat menjadi referensi perkembangan teknologi ...