Borneo Engineering: Jurnal Teknik Sipil
Volume 7 Nomor 1 Tahun 2023

PENILAIAN RISIKO BENDUNGAN TILONG BERBASIS METODE INDEKS RISIKO

Hotma Lamtio Purba (Program Magister, Jurusan Teknik Sipil, Universitas Diponegoro)
Sukamta Sukamta (Program Magister, Jurusan Teknik Sipil, Universitas Diponegoro)
Kresno Wikan Sadono (Program Magister, Jurusan Teknik Sipil, Universitas Diponegoro)



Article Info

Publish Date
30 Apr 2023

Abstract

Risk assessment aims to identify risks that may occur in various conditions, so that the necessary action plan can be carried out if the risk is unacceptable. In this study, the value of safety level in Tilong Dam, located at Kupang Regency, NTT is calculated.  The method used in this research is the risk index method. The method is based on a combination of importance of a dam factors, relative importance of physical conditions, and current condition from inspection. The result of this study shows that Tilong Dam has an importance of a dam factors (Idam) was 630, the total index risk was 116,55, and the safety level was 81,5. Tilong dam could be classified as satisfactory condition (safety level75), so that no action plan is needed because it is categorized as safe under normal and extraordinary load conditions.

Copyrights © 2023






Journal Info

Abbrev

bejts

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Focus and Scope Borneo Engineering : Structural Engineering, Transportation Engineering, Water Resources, Geotechnical Engineering and Construction ...