Journal of Industrial Engineering Management
Vol 8, No 1 (2023): Journal of Industrial Engineering and Management Vol 8 No 1

THE MAINTENANCE INTERVAL OF PREBREAKER CRITICAL COMPONENTS USING RELIABILITY-CENTERED MAINTENANCE IN PT XYZ

Haming, Puadi (Unknown)
Arminas, Arminas (Unknown)
Fajri, Nofias (Unknown)
Efendi, Dodi (Unknown)



Article Info

Publish Date
20 Apr 2023

Abstract

PT XYZ is a crumb rubber company that produces SIR 10 and rubber smoke sheets (RSS). As the biggest crumb rubber-produced company in Indonesia PT XYZ makes the production process sustainable. The often problem in this company is machine breakdown that occurs downtime value to be high. The highest downtime value from October 2020 until March 2021 was the Prebreaker Machine whose total downtime value was 1875 minutes. The Reliability Centered Maintenance (RCM) method is used for decreasing downtime value. The RCM is integrated with Failure Mode Effect Analysis (FMEA) for analyzing The Highest Risk Priority Number (RPN). The research results that the optimal maintenance time of the Prebreaker Machine is 51 hours which means the Prebreaker Machine is maintained after operation for 51 hours.

Copyrights © 2023






Journal Info

Abbrev

JIEM

Publisher

Subject

Control & Systems Engineering Decision Sciences, Operations Research & Management Energy Engineering Industrial & Manufacturing Engineering

Description

Journal of Industrial Engineering and Management memiliki No.ISSN : 2541-3090 (Cetak) dan No.ISSN : 2541-3090 (Online). Journal of Industrial Engineering and Management diterbitkan oleh Prodi Jurusan Teknik Industri Fakultas Teknologi Industri Universitas Muslim Indonesia. Terbit 2 (Dua) kali dalam ...