Jurnal Rekayasa elektrika
Vol 11, No 2 (2014)

Kapasitas Daya Pembangkit Listrik Tenaga Mikrohidro di Alue Dua Aceh Utara

Asri asri (Universitas Malikussaleh)



Article Info

Publish Date
04 Oct 2014

Abstract

The utilization of micro hydropower plant is intended for providing electricity at Alue Dua village in North Aceh. A problem associated with the implementation of the micro-hydropower plant in the village is that the water flowrate of the run-of-river is varied at 117 litres per second during the wet season and at 36 litres per second during the dry season. This variation affects the speed of the water turbine and the capacity of power generated by its generator. Therefore to stabilize the output power and voltage of the generator during the course of the year, this paper aims to regulate the intake water flowing into the water turbine by controlling the opening vent valve from 0% up to 100% and controlling the electrical load connected to the generator. The speed of the water turbine was measured using the tachometer. It was found that the generator can produce electricity at its rated power 40 kVA during the wet season by opening the valve at 100% and at 12 kVA with the opening valve at 30% during the dry season. Opening the vent valve at 100% during the dry season can drain the water within 12 minutes

Copyrights © 2014






Journal Info

Abbrev

JRE

Publisher

Subject

Computer Science & IT Control & Systems Engineering Electrical & Electronics Engineering Energy Engineering

Description

The journal publishes original papers in the field of electrical, computer and informatics engineering which covers, but not limited to, the following scope: Electronics: Electronic Materials, Microelectronic System, Design and Implementation of Application Specific Integrated Circuits (ASIC), VLSI ...