Jurnal Ilmiah Teknik Industri
Vol. 12, No. 1, Juni 2013

MODIFIKASI MEKANISME PENENTUAN PENJADWALAN JOB PADA METODE DANNENBRING

Tannady, Hendy ( Program Studi Teknik Industri, Fakultas Teknologi dan Desain, Universitas Bunda Mulia, Jln. Lodan Raya No. 2-Ancol-Jakarta Utara 14350)



Article Info

Publish Date
30 Jun 2013

Abstract

Scheduling methods particularly in scheduling a job toward machine capacity is often not optimal in generating the minimum makespan time due to the inappropriate mechanism of determining the schedule from the job. By using an appropriate mechanism on the local search for both of the job order towards machine and the recapitulation of the makespan in each job in order to produce the optimal scheduling is proved an effective approach to minimize the error of the end time processes that are too long. This approach is also able to provide the optimal solution for the work planning. This research focuses on the searching for some mechanism design alternatives in job scheduling by employing the makespan recapitulation table of each job on the machine determined by Dannenbring method. The result of this research shows that the smallest possible makespan time is 93, by following the order of job j1-j7-j2-j8-j4-j5-j6-j3, j1-j6-j2-j7-j8-j4-j5-j3 and j1-j6-j2-j4-j8-j7-j5-j3 using hybrid Pi1 earlier mechanism and hybrid Pi2 earlier mechanism.

Copyrights © 2013






Journal Info

Abbrev

jiti

Publisher

Subject

Industrial & Manufacturing Engineering

Description

Jurnal Ilmiah Teknik Industri is a scientific journal that aims to participate in developing the scientific field of Industrial Engineering, contains the results of research and theoretical study from lecturers, researchers and industry practitioners. Jurnal Ilmiah Teknik Industri is administered by ...