Greenation International Journal of Engineering Science
Vol. 1 No. 1 (2023): (GIJES) Greenation International Journal of Engineering Science (March 2023)

Analysis Capacity And Cost Tool Heavy To Production Work (Study Case : Building Construction New SMAN 2 Bukittinggi)

Prasetya Yoanda, Bima (Unknown)
Abdullah, Rijal (Unknown)



Article Info

Publish Date
01 Mar 2023

Abstract

In the implementation of quality work work very needed And will reflect production Work That alone. However, in the Building Construction project New SMAN 2 Bukittinggi does not use heavy equipment properly what have planned. Heavy equipment used produce low production so that raises impact negative for results production And cost on implementation project That alone. After do analysis calculation about capacity And cost usage tool heavy on building construction project New SMAN 2 Bukittinggi this, for can finish work in accordance with those who have planned on project, must know capacity productive in the field. Because with know capacity productivity in the field, will easy determine work in accordance with capacity And the cost. The need use capacity more production big on tool heavy, will determine production quality work.

Copyrights © 2023






Journal Info

Abbrev

GIJES

Publisher

Subject

Automotive Engineering Civil Engineering, Building, Construction & Architecture Control & Systems Engineering Electrical & Electronics Engineering Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

Technical Education Civil Engineering Electrical Engineering Informatics Engineering Craft Engineering Architectural Engineering Industrial Engineering Mechanical Engineering Environmental and Safety Technology Basic Chemical Engineering and Applied Chemistry Transportation Engineering Geology & ...