Journal of Management and Bussines (JOMB)
Vol 5 No 2 (2023): Journal of Management and Bussines (JOMB)

Analisis Utilisasi Kapasitas Menggunakan Metode Time-Driven Activity Based Costing (TDABC) pada Konveksi Wina

Rikha Diaz Saputri (Universitas Islam Negeri Sayyid Ali Rahmatullah Tulungagung)
Faizal Satria Desitama (Universitas Islam Negeri Sayyid Ali Rahmatullah Tulungagung)



Article Info

Publish Date
31 Oct 2023

Abstract

Aims to calculate unit costs and resource capacity usage at the Vienna Convection using the Time-Driven Activity Based Costing (TDABC) method. The method used is qualitative with a case study approach. The research results show that Konveksi Vienna's unit cost for size L white is IDR 34,861.17 and color IDR 34,911.17, size XL white is IDR 44,308.14 and color IDR 44,356.92 and size 3L white is IDR 56,042. 43 and color Rp. 56,093.06. At Konveksi Vienna there was a waste of overdeck sewing capacity of 13.63%, overlock sewing and pressure sewing of 35.22%. In conclusion, Vienna convection has a unit cost that is higher than the selling price for size 3L products and the highest capacity waste is in overlock sewing and pressure sewing. Keywords: Unit Cost, Convection, Time-Driven Activity Based Costing (TDABC)

Copyrights © 2023






Journal Info

Abbrev

JOMB

Publisher

Subject

Description

Journal of Management and Bussines (JOMB) focus dan scopenya meliputi; Manajemen Keuangan, Manajemen Pemasaran, Manajemen Sumber Daya Manusia, Manajemen Operasional, Manajemen Sistem Informasi, Manajemen Pajak dan, Administrasi ...