Jurnal Poros Teknik Mesin Unsrat
Vol. 5 No. 2 (2016): Jurnal Poros Teknik Mesin Unsrat

INTEGRASI ASPEK RESIKO PADA PROSES PENGELOLAAN SUKU CADANG DI PLTD BITUNG

Richard Juandy Salensehe (Unknown)
Agung Sutrisno (Unknown)
Johan S C Neyland (Unknown)



Article Info

Publish Date
25 Jul 2016

Abstract

The purpose of this research is to integrate aspects of risk in the process of managing spare parts in PLTD Bitung. To achieve these objectives, this research is using AHP methods (Analytical Hierarchy Proses).   Froms the result of the AHP the weight of the criteria are as follows : availability of goods (0,9542) delivery time (0,9986). Wear rate (1.3293), risk (1,1439). From AHP methods, priority supply of spareparts wish regards to all criteria, the highest priority given to nidlle bearing parts (1,4028).   Keyword : AHP, Risk, Needle bearing, Criteria

Copyrights © 2016






Journal Info

Abbrev

poros

Publisher

Subject

Automotive Engineering Industrial & Manufacturing Engineering Materials Science & Nanotechnology Mechanical Engineering

Description

Jurnal Poros Teknik Mesin Unsrat (JPTMU) merupakan jurnal yang diterbitkan oleh Jurusan Teknik Mesin Fakultas Teknik Universitas Sam Ratulangi dengan periode penulisan dua terbitan per tahun pada bulan Juli dan November. Artikel yang diterbitkan mencakup bidang Teknik Mesin dan Teknik ...