Evaluasi Perencanaan Proyek Pembangunan SDS X Menggunakan Network Diagram dan Crashing Project Guna Mengoptimalkan Waktu Dan Biaya Proyek

Ramadhan, Wahyu (Unknown)
Sitorus, Sutrisna (Unknown)
Maulana, Rizky (Unknown)



Article Info

Publish Date
18 Oct 2023

Abstract

The research focuses on evaluating the project time planning to know exactly when the project will be completed, the estimated budget to be spent, using the CPM and PERT methods to carry out an analysis of the SDS X Development Project Planning Evaluation. The results are with the CPM and PERT methods, the project's critical path is found in activities A – D – E – F – G – H – I – L – M – N with a project completion time using the CPM method is 52 days, while for the PERT method the project completion time is 54 days with a great chance of completing project work of 99, 94%. As for the results of the evaluation of cost planning using the crashing project method, it was found that there was an increase in costs of Rp. 6,902,000. So that the normal cost of a development project which is IDR 372,126.00 becomes IDR 379,028,000  

Copyrights © 2023






Journal Info

Abbrev

jutin

Publisher

Subject

Decision Sciences, Operations Research & Management Energy Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses ...