Jurnal Teknik Industri : Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri
Vol 10, No 1 (2024): JUNI 2024

Work System Design in the Wallet Production Process Using the Full Time Equivalent (FTE) and Cardiovascular Load (CVL) Method

Misbaghi, Yoni Fajar (Unknown)
Putra, Boy Isma (Unknown)



Article Info

Publish Date
05 Jun 2024

Abstract

UKM Gudang Dompet is a company that produces wallets. The number of orders will affect employee performance because the number of targets achieved will increase the workload for employees, causing fatigue. To prevent excessive fatigue felt by workers in the production division at the Dompet Warehouse, it is necessary to measure workload. The Full Time Equivalent (FTE) method measures working time, which is based on working time, measuring the time needed to complete a particular task and then converting it into an FTE index value. The cardiovascular load (CVL) method measures physical workload based on comparing pulses. Working pulse with a maximum pulse. This research showed that worker fatigue occurred in the packing section, indicated by a CVL value of more than 30%, so FTE calculations were carried out to determine energy consumption. Based on energy consumption calculations, the results obtained are an additional rest time of 32.85 minutes in the packing section. Keywords: workloads; full-time equivalent; CVL; work system design. 

Copyrights © 2024






Journal Info

Abbrev

jti

Publisher

Subject

Computer Science & IT Decision Sciences, Operations Research & Management Engineering Environmental Science Industrial & Manufacturing Engineering

Description

(ISSN : 2460-898X) JTI merupakan jurnal akademik yang dipublikasikan 2 kali setahun, meliputi bulan Juni dan Desember. Tujuan jurnal ini menyediakan tulisan yang memiliki yang fokus pada bidang Teknik Industri. lebih lanjut jurnal ini dipulikasikan oleh Jurusan Teknik Industri Fakultas Sains dan ...