Ocean Engineering: Jurnal Ilmu Teknik dan Teknologi Maritim
Vol. 3 No. 3 (2024): September: Jurnal Ilmu Teknik dan Teknologi Maritim

Analisis Biaya dan Waktu dengan Metode Time Cost Trade Off menggunakan Aplikasi Primavera P6

Muhammad Fahri Faqihhuddin (Unknown)



Article Info

Publish Date
31 Jul 2024

Abstract

In the construction industry, management costs and construction project time are important factors for achieving project success. Cost overruns and time delays can result in significant financial losses for project owners and contractors. Therefore, it is important to adopt an effective approach to construction management to optimize project costs and time. One method for overcoming problems in achieving construction project cost and time targets is the Time Cost Trade Off (TCTO) method. The TCTO method is an approach used in construction project management to achieve a balance between project costs and time. The analysis results show that the FO Krian Development Project, which has a normal duration of 522 days, can be accelerated to 500 days (scenario 1) and 498 days (scenario 2). Direct costs tend to increase due to additional working hours and additional workforce. The alternative used or which is more profitable in completing the project is to use scenario 2, namely additional labor due to a decrease in duration of 24 days from the normal project time and experiencing a decrease in total project costs of IDR 292,008,708.16.

Copyrights © 2024






Journal Info

Abbrev

ocean

Publisher

Subject

Engineering Mechanical Engineering

Description

Menyambut baik kiriman yang memberikan wawasan tentang masalah terkini dan utama yang berhubungan dengan ilmu Teknik dan Teknologi Maritim. Artikel bisa ditulis dalam bahasa Inggris atau bahasa ...