Jurnal Cakrawala Ilmiah
Vol. 3 No. 4: Desember 2023

DOWNHOLE MONITORING SUMUR GEOTHERMAL DENGAN METODE PRESSURE TEMPERATURE SHUT-IN SUMUR SR 1#2 DI PT PERTAMINA GEOTHERMAL ENERGY AREA LUMUT BALAI

Sefilra Andalucia (Program Studi Teknik Eksplorasi Produksi Migas, Politeknik Akamigas Palembang Jalan Gub. H. Bastari No.9, 8 Ulu, Kecamatan Seberang Ulu I, Kota Palembang, Sumatera Selatan, Indonesia-30257)
Rahman Wibowo (Program Studi Teknik Eksplorasi Produksi Migas, Politeknik Akamigas Palembang Jalan Gub. H. Bastari No.9, 8 Ulu, Kecamatan Seberang Ulu I, Kota Palembang, Sumatera Selatan, Indonesia-30257)



Article Info

Publish Date
24 Dec 2023

Abstract

SR 1#2 well is one of the Shut-in status production wells owned by PT Pertamina Geothermal Energy Area Lumut Balai which will be used for the supply of Steam PLTP Lumut Balai Unit II which is in the Engineering, Procurement, Construction, Commissioning (EPCC) stage. Downhole Monitoring activities are carried out to find out the latest data from SR 1#2 wells using the pressure temperature shut-in method. The measurement carried out on April 3, 2023 is a continuation of the pressure temperature shut-in program that was previously carried out in 2014, to process data and analyze the results of the pressure temperature shut-in. The results obtained from processing downhole monitoring data with the Pressure Temperature shut-in method using excel with the VLOOKUP formula and manual calculations, on April 3, 2023, the highest temperature was obtained at 233.67oC and pressure 84.02 bar at a depth of 1770 mKU and the results of the analysis of the Pressure Temperature Shut-in graph on April 3,2023 based on Shut-in Pressure Temperature comparison data in the previous year, namely on July 7, 2013 the highest pressure and temperature were at (88.92 bar and 235.93oC), on May 11, 2014 the highest pressure and temperature were at (85.94 bar and 232.91oC) and on April 3, 2023 with a span of 9 years the highest pressure and temperature at (84.02bar and 233.67oC) Then it can be concluded that the feedzone and reservoir from the SR 1#2 well have not experienced significant changes and will be used as a steam supply for PLTP unit II.

Copyrights © 2023






Journal Info

Abbrev

JCI

Publisher

Subject

Humanities Economics, Econometrics & Finance Languange, Linguistic, Communication & Media Law, Crime, Criminology & Criminal Justice Public Health Social Sciences Other

Description

Digitalisasi eknomi menembus batas wilayah negara dan kedaulatan ekonomi yang dapat saja menjadi peluang atau ancaman. Digitalisasi tidak bisa dihindari, tetap permsalahan utamanya adalah bagaimana negara ini harus dapat merumuskan kebijakan agar masyarakat kita jangan hanya menjadi sapi perahan ...