J-ENSITEC (Journal of Engineering and Sustainable Technology)
Vol. 10 No. 02 (2024): June 2024

PENGUKURAN KELELAHAN KERJA DAN EVALUASI POSTUR KERJA PADA PEKERJA PELONGGARAN GARAM

Basri, Moh. Subhan (Unknown)
Satoto, Handy Febri (Unknown)



Article Info

Publish Date
09 Jun 2024

Abstract

This study aims to measure the physical workload experienced by workers in Pegaraman 1 Sumenep, PT Garam (Persero). With a production of 115,000 tons per season, Pegaraman Area 1 Sumenep faces a huge challenge in achieving production targets with the use of efficient tools for workers. This is the problem that causes work fatigue, based on the identification of the research conducted. To overcome this problem, the research will focus on measuring the physical workload of salt loosening workers using the NBM, REBA, and CVL methods, in the hope of finding the right solution to solve problems related to work fatigue during the salt loosening process. The results showed that workers experienced physical workloads that needed action, with the results of the NBM recapitulation with a value of 50–70 risk levels, the REBA score with a value of 4, and CVL percentage values of 54.53% for the first worker, 55.21% for the second worker, and 53.67% for the third worker. Based on these findings, it can be concluded that the use of simple tools causes fatigue in workers. Therefore, an innovation is needed in the design of salt loosening tools to reduce the risk of fatigue in workers.

Copyrights © 2024






Journal Info

Abbrev

j-ensitec

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Computer Science & IT Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

J-ENSITEC (Journal Of Engineering and Sustainable Technology) terbit 2 (dua) kali dalam setahun. Sejak 2014, J-ENSITEC (Journal Of Engineering and Sustainable Technology) terbit pada bulan Desember dan Mei. Isi jurnal membahas hasil penelitian di bidang Teknik Informatika, Teknik Sipil, Teknik ...