VISUALISASI METODE PELAKSANAAN PEKERJAAN PELAT RAMP PROYEK PEMBANGUNAN GEDUNG WAREHOUSE DEPOK

Tati Noviati (Unknown)



Article Info

Publish Date
08 May 2024

Abstract

The Project of Depok Warehouse Building Construction is located at JL. Raya Jakarta-Bogor, KM. 35, Jatijajar, Depok City, West Java, 16415. The project of Depok Warehouse Building is built on a land area of 38,000 m2, with a building area of 24,000 m2. The Depok Warehouse Building has 8 floors, consisting of 5 floors for the building area and 3 mezzanine floors used for offices. PT. Depok Logistik Properti is the owner of the project, PT. Trimatra Jasa Prakarsa as the construction management, PT. Gistama Intisemesta as the planning consultant, and PT. Total Persada Indonesia as the main contractor. The type of contract used is a lump sum with a contract value of Rp 350,000,000,000. The planned duration of the Warehouse Building Construction project is 670 days. Research made on the field include upper structure works such as column, beam, floor slab, and ramp slab. The stages of the implementation method for the ramp Truck Plate Work start from preparation, marking, reinforcement fabrication, reinforcement installation, concrete decking installation, reinforcement checklist, formwork installation, verticality test, casting, formwork removal, and concrete curing.

Copyrights © 2024






Journal Info

Abbrev

JUIT

Publisher

Subject

Control & Systems Engineering Electrical & Electronics Engineering Engineering Industrial & Manufacturing Engineering

Description

Jurnal Ilmiah Teknik adalah jurnal yang ditujukan untuk publikasi artikel ilmiah yang diterbitkan oleh Asosiasi Dosen Muda Indonesia dan di payungi Oleh Yayasan Dosen Muda Indonesia. Jurnal ini adalah jurnal Ilmu Teknik yang bersifat peer-review dan terbuka. Bidang kajian dalam jurnal ini termasuk ...