Jurnal Sipil Terapan
Vol. 1 No. 2 (2023): November: Jurnal Sipil Terapan

Analisis Produktivitas Pekerja Pada Pekerjaan Pondasi dan Pemasangan Batu Bata Dengan Metode Work Study

Muhamad Fauzan Endar (Unknown)
Rahma Ramadhani (Unknown)
Meriana Wahyu Nugroho (Unknown)
Titin Sundari (Unknown)



Article Info

Publish Date
22 Dec 2023

Abstract

Work productivity is an element where the success of a project requires effective time and cost. This study aims to determine the productivity of foundation and brick workers. The work study method is an operations management technique used to increase work efficiency. The results of the analysis on foundation work with 2 groups (1 worker and 1 worker) using work study and AHSP 2021 for 1m3 with 1:3:10 specs obtained a productivity of 12.92 1m3 for 3 working days with a cost per 1m3 using the work study method, namely Rp.639,306 and AHSP 2021 Rp.782,517 with a difference of Rp. 143,211. The total cost of workers in foundation work using the work study method is IDR 8,257,273 and the 2021 AHSP is IDR 10,106,990 with a difference of IDR 1,849,717. In brick work with 1 group (1 mason 1 worker) using work study and AHSP 2021 for 1m2 with 1:3:10 specs, the productivity is 106.99 m2 for 9 working days with a cost per 1m2 using the work study method, namely Rp.60,696 and AHSP 2021 Rp.68,834 with a difference of Rp.8,138. The total cost of workers on brick work using the work study method is IDR 6,488,408 and AHSP 2021 is IDR 7,358,312 with a difference of IDR 869,904.

Copyrights © 2023






Journal Info

Abbrev

jusit

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Teknik Sipil meliputi bidang ilmu yang mempelajari perencanaan/perancangan, manufaktur, manajemen/pengelolaan, dan konservasi dari beragam fasilitas dan sistem untuk mendukung sebuah kota, pedesaan, dan ...