PERANCANGAN MANAJEMEN RISIKO PADA PROYEK PEMBANGUNAN LABORATORIUM TERINTEGRASI FAKULTAS TEKNIK UNDIP

Hera, Silvia Helvi (Unknown)
Purwanggono, Bambang (Unknown)
Ulkhaq, M. Mujiya (Unknown)



Article Info

Publish Date
26 Jun 2024

Abstract

AbstrakDalam melaksanakan proyek konstruksi dibutuhkan manajemen risiko untuk menghindari risiko-risiko yangterjadi dan mungkin terjadi yang menyebabkan kerugian diantaranya waktu (terjadi keterlambatan), biaya(pembengkakan biaya), dan mutu (tidak sesuai spesifikasi). Pembangunan Laboratorium Terintegrasi FTUndip merupakan proyek yang kompleks dan memiliki risiko-risiko potensial yang dapat mempengaruhikeberhasilan proyek. Pada keberjalanan proyek tersebut terdapat beberapa kendala sehingga terpengaruhpada pelaksanaannya, yakni beberapa perubahan desain, terdapat kesalahan pada gambar desain, danterjadi keterlambatan pasokan material. Oleh karena itu, penelitian ini melakukan identifikasi danpenilaian risiko menggunakan Relative Importance Index (RII), alokasi risiko dan memberikan strategiuntuk melakukan pengendalian terhadap tingkat risiko significant dan high. Identifikasi risiko yang akandigunakan dilakukan dengan studi literatur dan validasi lapangan yang diperoleh 30 faktor risiko dalam 5tahapan konstruksi pada proyek tersebut. Hasil penilaian RII diperoleh 4 faktor risiko significant terhadapdampak waktu, terdapat 1 risiko yang termasuk pada kategori high risk, 3 faktor risiko significantberdampak terhadap biaya, dan 2 faktor risiko significant berdampak terhadap kualitas. Mayoritas risikodialokasikan kepada kontraktor yaitu sebanyak 16 faktor risiko.Kata kunci: Manajemen Risiko; Proyek Konstruksi; Risiko; RII, Alokasi Risiko Abstract[Risk Management Design in Integrated Laboratory Construction Project Faculty of Engineering Undip]In executing construction projects, risk management is essential to avoid and mitigate risks that can lead tolosses, including delays, cost overruns, and quality issues. The construction of the Integrated Laboratory atFT Undip is a complex project with potential risks that could affect the project's success. During the courseof the project, several challenges impacted its execution, including design changes, errors in the designdrawings, and delays in material supply. Therefore, this research identifies and assesses risks using theRelative Importance Index (RII), risk allocation, and provides strategies to control significant and highlevelrisks.Riskidentificationwasconductedthroughliteraturereviewandfieldvalidation,resultingin30riskfactorsacrossfiveconstructionstagesoftheproject.TheRIIassessmentidentified4significantriskfactorsaffectingtime,1ofthemcategorizedashighrisk,3significantriskfactorsaffectingcost,and2significantrisk factors affecting quality. The majority of the risks, totaling 16, were allocated to thecontractor.Keywords:Risk Management;Construction Project;Risk; RII; Risk Allocation

Copyrights © 2024






Journal Info

Abbrev

ieoj

Publisher

Subject

Industrial & Manufacturing Engineering

Description

INDUSTRIAL ENGINEERING ONLINE JOURNAL adalah Karya Ilmiah S1 Program Studi Teknik Industri Fakultas Teknik Universitas Diponegoro yang memuat tulisan ilmiah dan hasil-hasil penelitian, kajian ilmiah, analisis dan pemecahan permasalahan di Industri yang erat hubungannya dengan bidang Ilmu Teknik ...