ANALISIS DAN MITIGASI RISIKO DENGAN MENGGUNAKAN METODE HOUSE OF RISK (STUDI KASUS: BAGIAN RECEIVING PT PUPUK KALIMANTAN TIMUR)

Azzahra, Aqila Nurfadiyah (Unknown)
Prastawa, Heru (Unknown)



Article Info

Publish Date
03 Oct 2024

Abstract

Abstrak Manajemen risiko sangat penting dalam memastikan kelancaran operasional perusahaan, termasuk didalam proses penerimaan barang yang krusial bagi kelangsungan produksi PT Pupuk KalimantanTimur (Pupuk Kaltim). Penelitian ini bertujuan untuk mengidentifikasi risiko-risiko yang terjadi padaBagian Receiving Pupuk Kaltim dan merancang strategi mitigasi yang efektif menggunakan metodeHouse of Risk. Metode ini terbagi menjadi dua fase, yaitu identifikasi risiko dan agen risiko pada fasepertama, serta penyusunan tindakan mitigasi pada fase kedua. Dari hasil penelitian, ditemukan 20kejadian risiko dan 20 agen risiko. Setelah dilakukan pemetaan dengan House of Risk fase 1, agenrisiko prioritas yang harus ditangani adalah human error dan pengabaian prosedur bongkar muat.Pada fase 2, dirumuskan 12 strategi mitigasi, di mana tindakan dengan prioritas tertinggi adalahinspeksi dadakan dan evaluasi rutin kinerja. Implementasi dari strategi ini diharapkan mampumengurangi potensi risiko dan meningkatkan efektivitas operasional di Bagian Receiving PupukKaltim.Kata Kunci : House of Risk, Mitigasi Risiko Abstract Risk management is crucial for ensuring the smooth operation of a company, including in the criticalprocess of receiving goods at PT Pupuk Kalimantan Timur (Pupuk Kaltim). This study aims to identifyrisks occurring in the Receiving Department of Pupuk Kaltim and design effective mitigation strategiesusing the House of Risk method. The method consists of two phases: identifying risks and risk agents inthe first phase, and developing mitigation actions in the second phase. The study identified 20 risk eventsand 20 risk agents. House of Risk Phase 1 mapping revealed that the priority risk agents to address arehuman error and neglect of loading and unloading procedures. In Phase 2, 12 mitigation strategieswere formulated, with the highest priority actions being unannounced inspections and routineperformance evaluations. Implementing these strategies is expected to reduce potential risks andenhance operational effectiveness in the Receiving Department of Pupuk Kaltim.Keywords : House of Risk, Risk Mitigation

Copyrights © 2024






Journal Info

Abbrev

ieoj

Publisher

Subject

Industrial & Manufacturing Engineering

Description

INDUSTRIAL ENGINEERING ONLINE JOURNAL adalah Karya Ilmiah S1 Program Studi Teknik Industri Fakultas Teknik Universitas Diponegoro yang memuat tulisan ilmiah dan hasil-hasil penelitian, kajian ilmiah, analisis dan pemecahan permasalahan di Industri yang erat hubungannya dengan bidang Ilmu Teknik ...