PT Swadaya Graha is a company that works in the field of construction, fabrication and steel manufacturing. One of the machines used in carrying out its operational activities is the Baoji 1660A lathe. The lathe often fails during the production process. This study aims to determine critical components, critical component reliability values, maintenance scheduling intervals and maintenance cost estimates of the Baoji 1660A lathe using the Reliability Centered Maintenance (RCM) method. The results of this study show that the electrical system with an RPN value of 240, v-belt with an RPN value of 168, and gearbox with an RPN value of 60 as critical components. The reliability value of the electrical system approaches 0.5 at a time interval of 640 hours or 80 working days, the reliability value of the v-belt approaches 0.5 at a time interval of 208 hours or 26 working days, and the reliability value of the gearbox approaches 0.5 at a time interval of 384 hours or 48 working days. From the scheduling interval, the estimated total maintenance cost in 2025 is IDR 7,019,092, in 2026 is IDR 3,615,386, in 2027 is IDR 4,187,484, in 2028 is IDR 4,276,752, and in 2029 is IDR 3,615,386.
Copyrights © 2024